Network Break Sponsor

Well Innovation

Sponsorship & Exhibition Opportunities Now Available For 2019

Exhibition Floor Now Open - Reserve Your Place Early For 2019


E&Ps can come up with the optimal production optimization strategies, but they cannot execute any of it without the right technologies, support, and third-party services.

Contact the ABC team at sponsorship@american-business-conferences.com to reserve strategic speaking slots and/or exhibition booths at the the Rocky Mountain specific production optimization & artificial lift design congress, where E&Ps are on the look out for the latest automation and well treatment technologies.

  • Production Optimization Consultants
  • Innovative Pump Design Options For Effective Gas Handling
  • Latest Surveillance Technology Solutions To Predict & Prevent Failures
  • New Age Sensor & Well Control Technology Providers
  • Smart Control Options To Make Smarter Decisions
  • Latest Technology Options To Prevent Gas Interference
  • Fluid Homogenization Alternatives To Maintain A Stable Operating Environment
  • Drilling And Completions Consulting Firms
  • Software Providers To Utilize Predictive Data Analytics
  • Production Optimization Consultants
  • Sand Control Solution Providers
  • Flowback Management Techniques
  • Well Corrosion Treatment Solutions

Matthew Wortmann

Production Engineer

North Plains Energy

Mr. Wortmann began his career in Oil & Gas in 2005 with Chevron U.S.A in the U.S. Gulf of Mexico.  During his time with Chevron; he held various positions in Reservoir Engineering, Production Engineering and Production Operations.  In 2013 he transitioned from offshore operations to unconventional resources in Denver, CO, and has improved companywide bottom line economics by  focusing on artificial lift design, reliability and operations.  Since 2013 Mathew has held positions with Halcon Resources and BP Lover 48 across North Dakota and Wyoming.  During his time in the Rockies Matthew has worked with multiple forms of artificial lift including rod lift, ESP, plunger, and jet pump.  Mr. Wortmann is employed by NP Energy Services since 2016 and manages companywide production and operations.  Mr. Wortmann graduated from Louisiana State University in 2004 with a B.S. from the Craft and Hawkins Department of Petroleum Engineering.

Matthew Wortmann
BP19-SR

E&P Discount

E&P

FOCUS AREAS FOR 2019

Key Discussion Topic Areas On This Years Agenda

TECHNICAL CONFERENCE DAY 1: TUESDAY, 21 MAY, 2019

  • Gas Lift Application : Understand how to optimize drawdown rates in high pressure Rocky Mountain wells
  • Optimize Gas Lift Performance: From Early Stage To End Of Life. Assess optimal lift strategy to enhance drawdown capabilities
  • Make Production More Profitable In The Rocky Mountains : Techniques & new technologies that are bringing the most production online
  • Plunger Lift Optimization: Pump design and automation technologies to optimize cost and performance
  • ESP Optimization Strategy: Implement high volume ESP's to maximize pressue drawdown
  • Achieving Lift Automation Using Smart Controls: Learn how to automate and remotely monitor artificial lift systems
  • Improve Artificial Lift Maintenance & Reliability: Reduce wear & tear while keeping lifts optimized & prolong run life
  • Seamlessly Integrate Machine Learning & AI Into Existing Processes: Examine how to incorporate AI into operations to drive up efficiency and run life

TECHNICAL CONFERENCE DAY 2: WEDNESDAY, 22 MAY, 2019

  • Remotely Monitor And Control Well Sites: Assess latest sensor technologies available to inspect and control well sites
  • Gather & Analyze Production Data: Collect accurate field data to effectively analyze it
  • Learn How To Move From A Manual To An Automated Wellhead Setup: Cost-effectively transition and enhance operational efficiencies
  • Gas Handling Pump Design & Fluid Homogenization: Examine innovative design options to better handle gas & improve drawdown
  • Prevent Gas Interference: Learn how to mitigate gas related issues and maintain a consistent route to drawdown
  • Sand Control & Flowback Strategies: Handle large sand volumes during production to prevent equipment failure
  • Corrosion Treatment: Examine new materials and treatment options to combat corrosive effects on wells

JOIN OUR MAILING LIST

By continuing to use this site you agree to the use of cookies. For more information and to find out how to change this click here